BENAVIDES FAMILY MINERALS A Well Details
Texas Wells · Webb County · HAWKVILLE (EAGLEFORD SHALE) field · not found
API No.
Latest Permit
Spud Date
Latest Completion
BENAVIDES FAMILY MINERALS A (API 47943834) is operated by not found and sits in the HAWKVILLE (EAGLEFORD SHALE) oil & gas field of Webb County, Texas.
Surface location: 27.0000, -99.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (3,427,139 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-02-06
→ 2018-02-09 |
Laredo Energy Operating, LLC | 6,653 | 12,702 | 3,427,139 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-04-16 | Administrative re-save | not found | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |
| 2024-04-03 |
New permit 2024-04-03 Completion 2022-07-12 Type → Shut-In Producer Operator → not found |
not found | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |
| 2019-11-18 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-08-22 |
New permit 2019-08-22 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-01-04 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2018-10-04 |
Initial filing Permit: 2018-10-04 Spud: 2017-12-09 Completion: 2018-03-06 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |