REUTHINGER Well Details
Texas Wells · Webb County · HAWKVILLE (EAGLEFORD SHALE) field · LAREDO ENERGY OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
REUTHINGER (API 47943946) is operated by LAREDO ENERGY OPERATING, LLC and sits in the HAWKVILLE (EAGLEFORD SHALE) oil & gas field of Webb County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (2,777,707 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-07-13
→ 2018-07-14 |
Laredo Energy Operating, LLC | 6,952 | 13,380 | 2,777,707 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-11-21 |
New permit 2019-09-03 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-11-20 |
New permit 2019-08-07 Completion 2018-07-21 Type → Producing |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-10-10 |
New permit 2019-06-20 Completion 2018-05-18 Type → Shut-In Producer |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |
| 2019-09-03 |
New permit 2019-09-03 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-08-07 |
New permit 2019-08-07 Completion 2018-07-21 Type → Producing |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-06-20 |
Initial filing Permit: 2019-06-20 Spud: 2018-04-21 Completion: 2018-05-18 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |