ATLANTIC INLAND GROUP-HUISACHE A Well Details
Texas Wells · Webb County · HAWKVILLE (EAGLEFORD SHALE) field · LAREDO ENERGY OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
ATLANTIC INLAND GROUP-HUISACHE A (API 47944126) is operated by LAREDO ENERGY OPERATING, LLC and sits in the HAWKVILLE (EAGLEFORD SHALE) oil & gas field of Webb County, Texas.
Surface location: 27.0000, -99.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (17,893,567 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-09-23
→ 2019-11-06 |
Laredo Energy Operating, LLC | 9,100 | 12,935 | 17,893,567 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-08-16 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2021-08-05 |
New permit 2021-08-05 Completion 2021-08-03 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2020-05-12 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2020-01-09 |
New permit 2020-01-09 Completion 2019-10-17 Type → Producing |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2019-11-14 | Administrative re-save | LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |
| 2019-08-01 |
Initial filing Permit: 2019-08-01 Spud: 2019-04-28 Completion: 2019-07-03 |
LAREDO ENERGY OPERATING, LLC | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |