BRISCOE C Well Details
Texas Wells · Webb County · LORENZO (AUSTIN CHALK) field · SM ENERGY COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
BRISCOE C (API 47944448) is operated by SM ENERGY COMPANY and sits in the LORENZO (AUSTIN CHALK) oil & gas field of Webb County, Texas.
Surface location: 28.1267, -99.9943
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (15,767,472 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2021-12-29
→ 2022-01-22 |
SM Energy | 11,156 | 6,626 | 15,767,472 | — |
Update History (8 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-02-15 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2023-01-23 |
New permit 2023-01-23 Completion 2023-01-18 |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2022-08-11 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2022-07-20 |
New permit 2022-07-20 Completion 2022-07-12 |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2022-06-16 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2022-06-02 |
New permit 2022-06-02 Completion 2022-03-12 Type → Producing |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2022-01-07 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Shut-In Producer / Horizontal |
| 2021-12-20 |
Initial filing Permit: 2021-12-20 Spud: 2021-08-13 Completion: 2021-08-26 |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Shut-In Producer / Horizontal |