BRISCOE J (SA7) Well Details
Texas Wells · Webb County · LORENZO (AUSTIN CHALK) field · SM ENERGY COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
BRISCOE J (SA7) (API 47945042) is operated by SM ENERGY COMPANY and sits in the LORENZO (AUSTIN CHALK) oil & gas field of Webb County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (20,679,960 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2024-03-15
→ 2024-04-03 |
SM Energy | 13,980 | 7,340 | 20,679,960 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-05-14 |
New permit 2026-05-14 Completion 2026-03-12 |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2024-10-14 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2024-10-08 |
New permit 2024-10-08 Completion 2024-08-30 |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2024-08-07 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2024-07-22 |
New permit 2024-07-22 Completion 2024-05-03 Type → Producing |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Producing / Horizontal |
| 2024-06-14 | Administrative re-save | SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Shut-In Producer / Horizontal |
| 2024-05-06 |
Initial filing Permit: 2024-05-06 Spud: 2023-11-13 Completion: 2023-12-11 |
SM ENERGY COMPANY | LORENZO (AUSTIN CHALK) | Shut-In Producer / Horizontal |