MILLER-PALT UNIT Well Details
Texas Wells · Wharton County · HUTCHINS-KUBELA (FRIO 4380) field · RICOCHET ENERGY, INC.
API No.
Latest Permit
Spud Date
Latest Completion
MILLER-PALT UNIT (API 48135352) is operated by RICOCHET ENERGY, INC. and sits in the HUTCHINS-KUBELA (FRIO 4380) oil & gas field of Wharton County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (18,480 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2015-05-06 | Ricochet Energy, Inc. | — | 8,600 | 18,480 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-06-10 | Administrative re-save | RICOCHET ENERGY, INC. | HUTCHINS-KUBELA (FRIO 4380) | Producing / Directional |
| 2018-08-07 |
New permit 2018-08-07 Completion 2015-12-08 Field → HUTCHINS-KUBELA (FRIO 4380) |
RICOCHET ENERGY, INC. | HUTCHINS-KUBELA (FRIO 4380) | Producing / Directional |
| 2016-02-24 | Administrative re-save | RICOCHET ENERGY, INC. | PHASE FOUR (9050 YEGUA) | Producing / Directional |
| 2015-03-06 |
Initial filing Permit: 2015-03-06 Spud: 2014-10-08 Completion: 2014-10-29 |
RICOCHET ENERGY, INC. | PHASE FOUR (9050 YEGUA) | Producing / Directional |