SUMNER, FRANCES Well Details
Texas Wells · Wilbarger County · WILBARGER COUNTY (SPECIAL) field · LAYLINE ENERGY I LLC
API No.
Latest Permit
Spud Date
Latest Completion
SUMNER, FRANCES (API 48732860) is operated by LAYLINE ENERGY I LLC and sits in the WILBARGER COUNTY (SPECIAL) oil & gas field of Wilbarger County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (0 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2012-04-12 | WG Operating, Inc. | — | — | — | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-10-12 | Administrative re-save | LAYLINE ENERGY I LLC | WILBARGER COUNTY (SPECIAL) | Producing / Vertical |
| 2016-10-11 |
New permit 2016-10-11 Spudded 2012-03-30 Completion 2016-10-05 Operator → LAYLINE ENERGY I LLC |
LAYLINE ENERGY I LLC | WILBARGER COUNTY (SPECIAL) | Producing / Vertical |
| 2013-10-28 |
New permit 2013-10-23 Completion 2013-03-13 Operator → HALCON OPERATING CO., INC. |
HALCON OPERATING CO., INC. | WILBARGER COUNTY (SPECIAL) | Producing / Vertical |
| 2012-08-07 |
Initial filing Permit: 2012-05-03 Completion: 2012-04-16 |
WG OPERATING, INC. | WILBARGER COUNTY (SPECIAL) | Producing / Vertical |