UL YELLOWTAIL C 21-29-17 TB Well Details
Texas Wells · Winkler County · PHANTOM (WOLFCAMP) field · PERCUSSION PETROLEUM OPER II,LLC
API No.
Latest Permit
Spud Date
Latest Completion
UL YELLOWTAIL C 21-29-17 TB (API 49534040) is operated by PERCUSSION PETROLEUM OPER II,LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Winkler County, Texas.
Surface location: 31.7148, -103.2349
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (51,594,467 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-09-04
→ 2018-09-05 |
Oasis Petroleum | 10,358 | 11,783 | 26,350,089 | — |
|
2018-09-03
→ 2018-09-05 |
Oasis Petroleum | 10,358 | 11,980 | 25,244,378 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-03-17 | Administrative re-save | PERCUSSION PETROLEUM OPER II,LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2022-02-04 |
New permit 2022-02-04 Operator → PERCUSSION PETROLEUM OPER II,LLC |
PERCUSSION PETROLEUM OPER II,LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-06-13 | Administrative re-save | OASIS PETROLEUM PERMIAN LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2019-02-12 |
Initial filing Permit: 2019-02-12 Spud: 2018-03-30 Completion: 2018-10-09 |
OASIS PETROLEUM PERMIAN LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |