STAGECOACH B 27-33-28 WB Well Details
Texas Wells · Winkler County · PHANTOM (WOLFCAMP) field · PERCUSSION PETROLEUM OPER II,LLC
API No.
Latest Permit
Spud Date
Latest Completion
STAGECOACH B 27-33-28 WB (API 49534679) is operated by PERCUSSION PETROLEUM OPER II,LLC and sits in the PHANTOM (WOLFCAMP) oil & gas field of Winkler County, Texas.
Surface location: 31.8014, -103.2612
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (41,206,033 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2022-10-03
→ 2022-10-20 |
Percussion Petroleum II, LLC | 10,187 | 12,027 | 27,785,239 | — |
|
2022-10-01
→ 2022-10-12 |
Percussion Petroleum II, LLC | 10,187 | 12,353 | 13,420,794 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2023-02-02 |
New permit 2023-01-04 |
PERCUSSION PETROLEUM OPER II,LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-02-01 |
New permit 2022-12-02 |
PERCUSSION PETROLEUM OPER II,LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2023-01-04 |
New permit 2023-01-04 |
PERCUSSION PETROLEUM OPER II,LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |
| 2022-12-02 |
Initial filing Permit: 2022-12-02 Spud: 2022-04-04 Completion: 2022-07-17 |
PERCUSSION PETROLEUM OPER II,LLC | PHANTOM (WOLFCAMP) | Producing / Horizontal |