COP Well Details
Texas Wells · Winkler County · KEYSTONE (WOLFCAMP) field · BOYD & MCWILLIAMS OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
COP (API 49534804) is operated by BOYD & MCWILLIAMS OPERATING, LLC and sits in the KEYSTONE (WOLFCAMP) oil & gas field of Winkler County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,838,267 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-12-09
→ 2023-12-13 |
Boyd & McWilliams Operating, LLC | 7,211 | 7,724 | 8,838,267 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-05-29 | Administrative re-save | BOYD & MCWILLIAMS OPERATING, LLC | KEYSTONE (WOLFCAMP) | Producing / Horizontal |
| 2024-02-20 |
New permit 2024-02-20 Spudded 2023-10-08 Completion 2023-12-22 Type → Producing |
BOYD & MCWILLIAMS OPERATING, LLC | KEYSTONE (WOLFCAMP) | Producing / Horizontal |
| 2023-10-24 | Administrative re-save | BOYD & MCWILLIAMS OPERATING, LLC | KEYSTONE (WOLFCAMP) | Shut-In Producer / Horizontal |
| 2023-09-07 |
Initial filing Permit: 2023-09-07 Spud: 2022-10-08 Completion: 2022-10-26 |
BOYD & MCWILLIAMS OPERATING, LLC | KEYSTONE (WOLFCAMP) | Shut-In Producer / Horizontal |