STOPPED SHORT 396-365 B UNIT Well Details
Texas Wells · Yoakum County · PLATANG (SAN ANDRES) field · STEWARD ENERGY II, LLC
API No.
Latest Permit
Spud Date
Latest Completion
STOPPED SHORT 396-365 B UNIT (API 50136811) is operated by STEWARD ENERGY II, LLC and sits in the PLATANG (SAN ANDRES) oil & gas field of Yoakum County, Texas.
Surface location: 33.2047, -102.9328
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (3,612,473 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-07-26
→ 2017-07-30 |
Hadaway Consulting and Engineering, LLC | 7,395 | 5,306 | 3,612,473 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-11-03 | Administrative re-save | STEWARD ENERGY II, LLC | PLATANG (SAN ANDRES) | Producing / Horizontal |
| 2022-11-02 |
New permit 2022-11-02 Operator → STEWARD ENERGY II, LLC Field → PLATANG (SAN ANDRES) |
STEWARD ENERGY II, LLC | PLATANG (SAN ANDRES) | Producing / Horizontal |
| 2018-04-30 | Administrative re-save | HADAWAY CONSULT AND ENGINEER,LLC | SABLE (SAN ANDRES) | Producing / Horizontal |
| 2017-12-27 |
Initial filing Permit: 2017-12-27 Spud: 2017-07-03 Completion: 2017-08-14 |
HADAWAY CONSULT AND ENGINEER,LLC | SABLE (SAN ANDRES) | Producing / Horizontal |