TREVINO Well Details
Texas Wells · Zapata County · CISCO-BENAVIDES (LOBO CONS.) field · HILCORP ENERGY COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
TREVINO (API 50534862) is operated by HILCORP ENERGY COMPANY and sits in the CISCO-BENAVIDES (LOBO CONS.) oil & gas field of Zapata County, Texas.
Surface location: 26.0000, -99.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (79,848 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2019-03-14 | Hilcorp Energy Company | — | 6,134 | 79,848 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-07-28 |
New permit 2026-07-08 Field → CISCO-BENAVIDES (LOBO CONS.) |
HILCORP ENERGY COMPANY | CISCO-BENAVIDES (LOBO CONS.) | Producing / Vertical |
| 2026-07-24 |
New permit 2026-07-06 Field → BIG MAC (6470) |
HILCORP ENERGY COMPANY | BIG MAC (6470) | Producing / Vertical |
| 2026-07-08 |
New permit 2026-07-08 Field → CISCO-BENAVIDES (LOBO CONS.) |
HILCORP ENERGY COMPANY | CISCO-BENAVIDES (LOBO CONS.) | Producing / Vertical |
| 2026-07-06 |
New permit 2026-07-06 Spudded 2004-01-08 Completion 2024-07-18 |
HILCORP ENERGY COMPANY | BIG MAC (6470) | Producing / Vertical |
| 2020-07-29 | Administrative re-save | HILCORP ENERGY COMPANY | BIG MAC (6470) | Producing / Vertical |
| 2020-07-20 |
Initial filing Permit: 2020-07-20 Spud: 2004-01-18 Completion: 2017-08-10 |
HILCORP ENERGY COMPANY | BIG MAC (6470) | Producing / Vertical |