EL CLARENO Well Details
Texas Wells · Zapata County · ROLETA (7483) field · CANTERA OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
EL CLARENO (API 50536334) is operated by CANTERA OPERATING, LLC and sits in the ROLETA (7483) oil & gas field of Zapata County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (73,626 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-12-21
→ 2014-01-04 |
Cantera Operating LLC | — | 8,350 | 73,626 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2014-06-23 |
Spudded 2013-12-12 Field → ROLETA (7483) |
CANTERA OPERATING, LLC | ROLETA (7483) | Producing / Vertical |
| 2014-06-18 |
Initial filing Permit: 2014-02-22 Spud: 2013-12-02 Completion: 2014-01-08 |
CANTERA OPERATING, LLC | ROLETA (WILCOX CONSOLIDATED) | Producing / Vertical |