SIMMONS SUBDIVISION UNIT Well Details
Texas Wells · Atascosa County · EAGLEVILLE (EAGLE FORD-1) field · VENADO OPERATING COMPANY LLC
API No.
Latest Permit
Spud Date
Latest Completion
SIMMONS SUBDIVISION UNIT (API 01334656) is operated by VENADO OPERATING COMPANY LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of Atascosa County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,171,860 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-02-27 | EP Energy | 4,903 | 7,567 | 4,171,860 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2020-09-16 | Administrative re-save | VENADO OPERATING COMPANY LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2020-09-08 |
New permit 2020-09-08 Spudded 2013-02-27 Operator → VENADO OPERATING COMPANY LLC |
VENADO OPERATING COMPANY LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-07-11 |
New permit 2013-05-09 Completion 2013-03-05 Type → Producing |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-05-13 |
Initial filing Permit: 2013-03-15 Completion: 2013-02-19 |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |