HKH ALLOCATION #3 Well Details
Texas Wells · Atascosa County · EAGLEVILLE (EAGLE FORD-1) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
HKH ALLOCATION #3 (API 01335330) is operated by XTO ENERGY INC. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of Atascosa County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (20,452,316 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2024-07-22
→ 2024-08-05 |
XTO Energy/ExxonMobil | 9,345 | 10,623 | 14,226,568 | — |
|
2016-05-01
→ 2016-05-13 |
XTO Energy/ExxonMobil | 9,345 | 10,171 | 6,225,748 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-11-22 | Administrative re-save | XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2024-11-08 |
New permit 2024-11-08 Completion 2024-08-06 |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-08-09 | Administrative re-save | XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-07-27 |
New permit 2016-07-27 Completion 2016-06-29 Type → Producing |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-04-01 | Administrative re-save | XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2016-02-08 |
Initial filing Permit: 2016-02-08 Spud: 2015-09-26 Completion: 2015-11-20 |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |