J. PEELER A UNIT Well Details
Texas Wells · Atascosa County · EAGLEVILLE (EAGLE FORD-1) field · CARRIZO (EAGLE FORD) LLC
API No.
Latest Permit
Spud Date
Latest Completion
J. PEELER A UNIT (API 01335459) is operated by CARRIZO (EAGLE FORD) LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of Atascosa County, Texas.
Surface location: 28.7588, -98.4431
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (15,130,123 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-06-16
→ 2017-07-06 |
Carrizo Oil & Gas, Inc. | 7,372 | 9,310 | 15,130,123 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-10-24 | Administrative re-save | CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2017-08-24 |
New permit 2017-08-24 Completion 2017-07-06 Type → Producing |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2017-06-07 | Administrative re-save | CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2017-05-23 |
Initial filing Permit: 2017-05-23 Spud: 2017-03-26 Completion: 2017-04-09 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |