BIG HOSS Well Details
Texas Wells · Dawson County · SMITH (SPRABERRY) field · SMITH ENERGY OPERATING COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
BIG HOSS (API 11533327) is operated by SMITH ENERGY OPERATING COMPANY and sits in the SMITH (SPRABERRY) oil & gas field of Dawson County, Texas.
Surface location: 32.0000, -101.0000
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-03-19 |
New permit 2019-02-14 Completion 2019-02-14 Field → SMITH (SPRABERRY) |
SMITH ENERGY OPERATING COMPANY | SMITH (SPRABERRY) | Shut-In Producer / Vertical |
| 2019-02-25 |
New permit 2019-01-15 Completion 2019-01-09 Field → WILLENE (FUSSELMAN) |
SMITH ENERGY OPERATING COMPANY | WILLENE (FUSSELMAN) | Shut-In Producer / Vertical |
| 2019-02-14 |
New permit 2019-02-14 Completion 2019-02-14 Field → SMITH (SPRABERRY) |
SMITH ENERGY OPERATING COMPANY | SMITH (SPRABERRY) | Shut-In Producer / Vertical |
| 2019-01-15 |
New permit 2019-01-15 Completion 2019-01-09 |
SMITH ENERGY OPERATING COMPANY | WILLENE (FUSSELMAN) | Shut-In Producer / Vertical |
| 2019-01-07 | Administrative re-save | SMITH ENERGY OPERATING COMPANY | WILLENE (FUSSELMAN) | Shut-In Producer / Vertical |
| 2018-11-06 |
Initial filing Permit: 2018-11-06 Spud: 2010-08-11 Completion: 2018-10-17 |
SMITH ENERGY OPERATING COMPANY | WILLENE (FUSSELMAN) | Shut-In Producer / Vertical |