CARSON A Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-1) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
CARSON A (API 12333042) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (5,445,669 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2013-10-20
→ 2013-12-01 |
BHP Billiton Petroleum | 5,586 | 12,092 | 5,445,669 | — |
Update History (5 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-02-19 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2026-02-13 |
New permit 2026-02-13 Spudded 2013-06-04 Completion 2022-11-15 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-11-12 |
New permit 2014-08-12 Spudded 2013-06-14 Completion 2014-08-02 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-09-12 |
New permit 2014-06-30 Spudded 2014-06-04 Completion 2014-01-09 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-07-02 |
Initial filing Permit: 2014-02-04 Spud: 2013-06-04 Completion: 2013-08-30 |
GEOSOUTHERN ENERGY CORPORATION | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |