CLARK C Well Details
Texas Wells · DeWitt County · EAGLEVILLE (EAGLE FORD-1) field · DEVON ENERGY PRODUCTION CO, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
CLARK C (API 12333993) is operated by DEVON ENERGY PRODUCTION CO, L.P. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of DeWitt County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,134,503 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-12-01
→ 2015-12-16 |
BHP Billiton Petroleum | 5,854 | 11,935 | 6,134,503 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-08-05 |
New permit 2026-08-05 Completion 2026-07-25 |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-06-28 | Field → EAGLEVILLE (EAGLE FORD-1) | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-06-08 |
New permit 2016-06-08 Completion 2016-04-27 Field → EAGLEVILLE (EAGLE FORD-2) |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-2) | Producing / Horizontal |
| 2016-04-28 | Administrative re-save | DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-04-14 |
New permit 2016-04-14 Completion 2016-01-29 Type → Producing Operator → DEVON ENERGY PRODUCTION CO, L.P. Field → EAGLEVILLE (EAGLE FORD-1) |
DEVON ENERGY PRODUCTION CO, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-02-12 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |
| 2015-10-21 |
Initial filing Permit: 2015-10-21 Spud: 2015-03-28 Completion: 2015-05-13 |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-2) | Shut-In Producer / Horizontal |