CULPEPPER UNIT NO. 3 Well Details
Texas Wells · Gonzales County · EAGLEVILLE (EAGLE FORD-1) field · LONESTAR OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
CULPEPPER UNIT NO. 3 (API 17733977) is operated by LONESTAR OPERATING, LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of Gonzales County, Texas.
Surface location: 29.0000, -97.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,603,322 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-08-10
→ 2018-08-22 |
Lonestar Resources, Inc. | 5,657 | 7,956 | 8,603,322 | — |
Update History (2 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2018-12-19 | Administrative re-save | LONESTAR OPERATING, LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-10-23 |
Initial filing Permit: 2018-10-23 Spud: 2018-06-02 Completion: 2018-08-31 |
LONESTAR OPERATING, LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |