GARCIA UNIT II LAS Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · CHESAPEAKE OPERATING, L.L.C.
API No.
Latest Permit
Spud Date
Latest Completion
GARCIA UNIT II LAS (API 28333167) is operated by CHESAPEAKE OPERATING, L.L.C. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (5,428,290 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2012-11-02 | Chesapeake Operating, Inc. | 7,774 | 7,827 | 5,428,290 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-07-29 | Administrative re-save | CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2021-05-25 |
New permit 2021-05-25 Spudded 2012-06-08 Operator → CHESAPEAKE OPERATING, L.L.C. |
CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-03-11 |
New permit 2013-01-09 Completion 2012-11-18 Type → Producing |
CHESAPEAKE OPERATING, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-01-09 |
Initial filing Permit: 2012-10-26 Completion: 2012-06-25 |
CHESAPEAKE OPERATING, INC. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |