WK GU 12 Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · BHP BILLITON PET(TXLA OP) CO
API No.
Latest Permit
Spud Date
Latest Completion
WK GU 12 (API 28333221) is operated by BHP BILLITON PET(TXLA OP) CO and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (2,860,536 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2012-08-16 | BHP Billiton Petroleum | 4,867 | 10,150 | 2,860,536 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2019-01-14 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-10-29 |
New permit 2018-10-29 Spudded 2012-08-02 |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-11-06 |
New permit 2013-10-02 Completion 2012-08-20 Type → Producing Operator → BHP BILLITON PET(TXLA OP) CO Field → EAGLEVILLE (EAGLE FORD-1) |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-05-24 |
Initial filing Permit: 2012-08-20 Completion: 2012-07-22 |
PETROHAWK OPERATING COMPANY | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |