PIERCE Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · CARRIZO (EAGLE FORD) LLC
API No.
Latest Permit
Spud Date
Latest Completion
PIERCE (API 28333710) is operated by CARRIZO (EAGLE FORD) LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (7,976,124 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-12-16 | Carrizo Oil & Gas, Inc. | 6,932 | 9,979 | 7,976,124 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-03-31 | Administrative re-save | CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-10-17 |
New permit 2014-10-17 Field → EAGLEVILLE (EAGLE FORD-1) |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-05-20 |
New permit 2014-02-07 Spudded 2013-01-30 Completion 2013-12-26 Type → Producing |
CARRIZO (EAGLE FORD) LLC | HAWKVILLE (EAGLEFORD SHALE) | Producing / Horizontal |
| 2014-02-10 |
Initial filing Permit: 2013-05-17 Completion: 2013-02-15 |
CARRIZO (EAGLE FORD) LLC | HAWKVILLE (EAGLEFORD SHALE) | Shut-In Producer / Horizontal |