IRVIN EAST Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · CARRIZO (EAGLE FORD) LLC
API No.
Latest Permit
Spud Date
Latest Completion
IRVIN EAST (API 28333820) is operated by CARRIZO (EAGLE FORD) LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
Surface location: 28.5800, -98.9805
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (7,476,448 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2013-08-10 | Carrizo Oil & Gas, Inc. | 6,380 | 8,560 | 7,476,448 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2016-01-06 |
Spudded 2013-05-14 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-10-15 |
New permit 2015-10-15 Spudded 2013-03-12 Completion 2013-08-10 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-08-27 |
New permit 2014-06-19 Completion 2014-06-13 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-04-16 |
New permit 2014-04-15 Spudded 2013-05-14 Completion 2013-05-30 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2014-01-02 |
New permit 2013-10-14 Completion 2013-08-10 Type → Producing |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2013-10-25 |
Initial filing Permit: 2013-09-03 Completion: 2013-05-30 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |