IRVIN MINERALS SOUTH Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
IRVIN MINERALS SOUTH (API 28334341) is operated by XTO ENERGY INC. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 2 hydraulic-fracturing jobs on file
Sourced from the FracFocus chemical disclosure registry (18,121,416 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2023-06-09
→ 2023-06-23 |
XTO Energy/ExxonMobil | 6,874 | 8,783 | 11,951,994 | — |
|
2015-07-21
→ 2015-07-28 |
XTO Energy/ExxonMobil | 6,874 | 8,923 | 6,169,422 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-04-17 |
Completion 2023-07-28 |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2024-02-06 |
New permit 2024-02-06 Completion 2015-09-16 |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-02-25 | Administrative re-save | XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-01-15 |
New permit 2016-01-15 Completion 2015-09-17 Type → Producing |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-12-16 | Administrative re-save | XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2015-08-20 |
Initial filing Permit: 2015-08-20 Spud: 2015-03-28 Completion: 2015-04-16 |
XTO ENERGY INC. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |