ALTITO B Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · VERDUN OIL EF II LLC
API No.
Latest Permit
Spud Date
Latest Completion
ALTITO B (API 28335002) is operated by VERDUN OIL EF II LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,521,433 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-10-06
→ 2015-10-13 |
EP Energy | 5,657 | 9,813 | 8,521,433 | — |
Update History (8 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-07-07 | Administrative re-save | VERDUN OIL EF II LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2026-06-11 |
New permit 2026-06-11 Operator → VERDUN OIL EF II LLC |
VERDUN OIL EF II LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2024-10-10 | Administrative re-save | not found | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2024-08-22 |
New permit 2024-08-22 Operator → not found |
not found | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-01-20 |
New permit 2015-11-18 Completion 2015-10-19 Type → Producing |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-12-16 |
New permit 2015-10-05 Completion 2015-02-10 Type → Shut-In Producer |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2015-11-18 |
New permit 2015-11-18 Completion 2015-10-19 Type → Producing |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-10-05 |
Initial filing Permit: 2015-10-05 Spud: 2015-01-23 Completion: 2015-02-10 |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |