ALTITO B Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · VERDUN OIL EF II LLC
API No.
Latest Permit
Spud Date
Latest Completion
ALTITO B (API 28335003) is operated by VERDUN OIL EF II LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (8,309,562 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-10-06
→ 2015-10-13 |
EP Energy | 5,560 | 9,804 | 8,309,562 | — |
Update History (7 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2026-07-08 | Administrative re-save | VERDUN OIL EF II LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2026-06-11 |
New permit 2026-06-11 Operator → VERDUN OIL EF II LLC |
VERDUN OIL EF II LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-05-22 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-02-02 |
New permit 2018-02-02 |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2017-03-31 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2017-03-24 |
New permit 2017-03-24 Completion 2017-03-06 |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-11-14 |
Initial filing Permit: 2015-11-14 Spud: 2015-01-25 Completion: 2015-10-16 |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |