ALTITO B 302D UNIT Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · EP ENERGY E&P COMPANY, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
ALTITO B 302D UNIT (API 28335535) is operated by EP ENERGY E&P COMPANY, L.P. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (6,778,758 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-01-04
→ 2017-01-12 |
EP Energy | 5,712 | 9,281 | 6,778,758 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-03-02 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2017-02-15 |
New permit 2017-02-15 Completion 2017-01-18 Type → Producing |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-05-04 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2016-04-29 |
Initial filing Permit: 2016-04-29 Spud: 2015-11-15 Completion: 2015-12-01 |
EP ENERGY E&P COMPANY, L.P. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |