JASIK Well Details
Texas Wells · La Salle County · EAGLEVILLE (EAGLE FORD-1) field · CALLON (EAGLE FORD) LLC
API No.
Latest Permit
Spud Date
Latest Completion
JASIK (API 28335952) is operated by CALLON (EAGLE FORD) LLC and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of La Salle County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (9,618,605 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2018-03-17
→ 2018-04-12 |
Carrizo Oil & Gas, Inc. | 5,092 | 7,751 | 9,618,605 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-11-29 | Administrative re-save | CALLON (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2021-10-18 |
New permit 2021-10-18 Operator → CALLON (EAGLE FORD) LLC |
CALLON (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-07-20 |
New permit 2018-06-18 Completion 2018-04-04 Type → Producing |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-06-20 |
New permit 2018-03-16 Completion 2017-12-02 Type → Shut-In Producer |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2018-06-18 |
New permit 2018-06-18 Completion 2018-04-04 Type → Producing |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2018-03-16 |
Initial filing Permit: 2018-03-16 Spud: 2017-11-18 Completion: 2017-12-02 |
CARRIZO (EAGLE FORD) LLC | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |