ALTITO D 17A UNIT Well Details
Texas Wells · La Salle County · PEARSALL (AUSTIN CHALK) field · EP ENERGY E&P COMPANY, L.P.
API No.
Latest Permit
Spud Date
Latest Completion
ALTITO D 17A UNIT (API 28337038) is operated by EP ENERGY E&P COMPANY, L.P. and sits in the PEARSALL (AUSTIN CHALK) oil & gas field of La Salle County, Texas.
Surface location: 28.0000, -99.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (14,934,108 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2020-10-08
→ 2020-10-14 |
EP Energy | 7,216 | 9,274 | 14,934,108 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2021-07-15 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | PEARSALL (AUSTIN CHALK) | Producing / Horizontal |
| 2021-06-21 |
New permit 2021-06-21 |
EP ENERGY E&P COMPANY, L.P. | PEARSALL (AUSTIN CHALK) | Producing / Horizontal |
| 2021-03-24 | Administrative re-save | EP ENERGY E&P COMPANY, L.P. | PEARSALL (AUSTIN CHALK) | Producing / Horizontal |
| 2020-12-29 |
Initial filing Permit: 2020-12-29 Spud: 2020-07-21 Completion: 2020-10-15 |
EP ENERGY E&P COMPANY, L.P. | PEARSALL (AUSTIN CHALK) | Producing / Horizontal |