PEELER MCM Well Details
Texas Wells · McMullen County · EAGLEVILLE (EAGLE FORD-1) field · CHESAPEAKE OPERATING, L.L.C.
API No.
Latest Permit
Spud Date
Latest Completion
PEELER MCM (API 31136218) is operated by CHESAPEAKE OPERATING, L.L.C. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of McMullen County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,690,182 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2016-06-27
→ 2016-07-04 |
Chesapeake Operating, Inc. | 6,600 | 10,457 | 4,690,182 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-07-07 | Administrative re-save | CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2017-06-21 |
New permit 2017-06-21 Completion 2016-11-18 |
CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-10-12 | Administrative re-save | CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2016-10-05 |
New permit 2016-10-05 Completion 2016-08-25 Type → Producing |
CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-12-03 | Administrative re-save | CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2015-08-25 |
Initial filing Permit: 2015-08-25 Spud: 2014-11-19 Completion: 2015-07-31 |
CHESAPEAKE OPERATING, L.L.C. | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |