GW DEEP GAS UNIT 1 Well Details
Texas Wells · McMullen County · EAGLEVILLE (EAGLE FORD-1) field · BPX OPERATING COMPANY
API No.
Latest Permit
Spud Date
Latest Completion
GW DEEP GAS UNIT 1 (API 31136325) is operated by BPX OPERATING COMPANY and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of McMullen County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (10,855,711 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-04-15
→ 2015-05-05 |
BHP Billiton Petroleum | 6,003 | 13,535 | 10,855,711 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2025-08-15 | Administrative re-save | BPX OPERATING COMPANY | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2025-08-11 |
New permit 2025-08-11 Operator → BPX OPERATING COMPANY |
BPX OPERATING COMPANY | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-11-23 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-10-08 |
New permit 2015-10-08 Completion 2015-06-26 Type → Producing |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2015-06-25 | Administrative re-save | BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |
| 2015-03-24 |
Initial filing Permit: 2015-03-24 Spud: 2014-11-15 Completion: 2014-12-02 |
BHP BILLITON PET(TXLA OP) CO | EAGLEVILLE (EAGLE FORD-1) | Shut-In Producer / Horizontal |