DILWORTH RANCH Well Details
Texas Wells · McMullen County · EAGLEVILLE (EAGLE FORD-1) field · ROSEWOOD RESOURCES, INC.
API No.
Latest Permit
Spud Date
Latest Completion
DILWORTH RANCH (API 31136882) is operated by ROSEWOOD RESOURCES, INC. and sits in the EAGLEVILLE (EAGLE FORD-1) oil & gas field of McMullen County, Texas.
Surface location: 28.0000, -98.0000
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (13,200,600 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2019-05-05
→ 2019-05-26 |
Rosewood Resources | 5,685 | 10,806 | 13,200,600 | — |
Update History (10 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2024-08-19 | Administrative re-save | ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2024-07-23 |
New permit 2024-07-23 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2023-07-20 | Administrative re-save | ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2023-06-21 |
New permit 2023-06-21 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2020-06-09 |
New permit 2020-02-03 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2020-02-07 |
New permit 2019-10-30 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2020-02-03 |
New permit 2020-02-03 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2019-10-30 |
New permit 2019-10-30 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2019-10-17 | Administrative re-save | ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |
| 2019-07-03 |
Initial filing Permit: 2019-07-03 Spud: 2018-12-28 Completion: 2019-06-15 |
ROSEWOOD RESOURCES, INC. | EAGLEVILLE (EAGLE FORD-1) | Producing / Horizontal |