PATRICIA-NORRIS ALLOCATION Well Details
Texas Wells · Martin County · SPRABERRY (TREND AREA) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
PATRICIA-NORRIS ALLOCATION (API 31742346) is operated by XTO ENERGY INC. and sits in the SPRABERRY (TREND AREA) oil & gas field of Martin County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (17,626,182 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2021-07-07
→ 2021-07-23 |
XTO Energy/ExxonMobil | 11,430 | 8,762 | 17,626,182 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-01-31 | Administrative re-save | XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2021-11-23 |
New permit 2021-11-23 Completion 2021-10-02 Type → Producing |
XTO ENERGY INC. | SPRABERRY (TREND AREA) | Producing / Horizontal |
| 2020-06-11 | Administrative re-save | XTO ENERGY INC. | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |
| 2020-03-19 |
Initial filing Permit: 2020-03-19 Spud: 2019-10-29 Completion: 2019-11-29 |
XTO ENERGY INC. | SPRABERRY (TREND AREA) | Shut-In Producer / Horizontal |