HIDDEN SPRINGS Well Details
Texas Wells · Palo Pinto County · NEWARK, EAST (BARNETT SHALE) field · NEWARK E&P OPERATING, LLC
API No.
Latest Permit
Spud Date
Latest Completion
HIDDEN SPRINGS (API 36336228) is operated by NEWARK E&P OPERATING, LLC and sits in the NEWARK, EAST (BARNETT SHALE) oil & gas field of Palo Pinto County, Texas.
Surface location: 33.3065, -98.2177
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (773,934 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
| 2014-07-10 | Newark E&P Operating, LLC | — | 5,321 | 773,934 | — |
Update History (6 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2017-05-31 |
New permit 2016-07-21 Spudded 2014-06-20 Field → NEWARK, EAST (BARNETT SHALE) |
NEWARK E&P OPERATING, LLC | NEWARK, EAST (BARNETT SHALE) | Producing / Vertical |
| 2016-08-31 |
New permit 2016-07-20 Spudded 2016-06-20 Field → BURNS-DALTON(MARBLE FALLS) |
NEWARK E&P OPERATING, LLC | BURNS-DALTON(MARBLE FALLS) | Producing / Vertical |
| 2016-07-21 |
New permit 2016-07-21 Spudded 2014-06-20 Field → NEWARK, EAST (BARNETT SHALE) |
NEWARK E&P OPERATING, LLC | NEWARK, EAST (BARNETT SHALE) | Producing / Vertical |
| 2016-07-20 |
New permit 2016-07-20 Spudded 2016-06-20 Completion 2016-06-07 |
NEWARK E&P OPERATING, LLC | BURNS-DALTON(MARBLE FALLS) | Producing / Vertical |
| 2014-11-18 |
New permit 2014-11-14 |
NEWARK E&P OPERATING, LLC | BURNS-DALTON(MARBLE FALLS) | Producing / Vertical |
| 2014-10-20 |
Initial filing Permit: 2014-10-16 Spud: 2014-06-20 Completion: 2014-08-02 |
NEWARK E&P OPERATING, LLC | BURNS-DALTON(MARBLE FALLS) | Producing / Vertical |