HOSLER UNIT Well Details
Texas Wells · Tarrant County · NEWARK, EAST (BARNETT SHALE) field · XTO ENERGY INC.
API No.
Latest Permit
Spud Date
Latest Completion
HOSLER UNIT (API 43936759) is operated by XTO ENERGY INC. and sits in the NEWARK, EAST (BARNETT SHALE) oil & gas field of Tarrant County, Texas.
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (2,499,168 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2015-03-19
→ 2015-03-24 |
XTO Energy/ExxonMobil | 2,203 | 7,247 | 2,499,168 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2015-09-24 | Administrative re-save | XTO ENERGY INC. | NEWARK, EAST (BARNETT SHALE) | Producing / Horizontal |
| 2015-09-03 |
New permit 2015-09-03 Completion 2015-05-18 Type → Producing |
XTO ENERGY INC. | NEWARK, EAST (BARNETT SHALE) | Producing / Horizontal |
| 2015-05-29 | Administrative re-save | XTO ENERGY INC. | NEWARK, EAST (BARNETT SHALE) | Shut-In Producer / Horizontal |
| 2015-01-26 |
Initial filing Permit: 2015-01-26 Spud: 2014-09-18 Completion: 2014-09-28 |
XTO ENERGY INC. | NEWARK, EAST (BARNETT SHALE) | Shut-In Producer / Horizontal |