KAKER HEIRS Well Details
Texas Wells · Wise County · NEWARK, EAST (BARNETT SHALE) field · LAKOTA ENERGY, LTD.
API No.
Latest Permit
Spud Date
Latest Completion
KAKER HEIRS (API 49737935) is operated by LAKOTA ENERGY, LTD. and sits in the NEWARK, EAST (BARNETT SHALE) oil & gas field of Wise County, Texas.
Surface location: 33.1286, -97.8188
FracFocus Records 1 hydraulic-fracturing job on file
Sourced from the FracFocus chemical disclosure registry (4,549,523 gallons of base fluid and 0 lbs of proppant across all reported jobs).
| Job dates | Operator | Lateral length (ft) | TVD (ft) | Water (gal) | Proppant (lbs) |
|---|---|---|---|---|---|
|
2017-12-26
→ 2017-12-29 |
Lakota Energy, LTD. | 3,759 | 6,849 | 4,549,523 | — |
Update History (4 records)
Each row below records one filing or status update. Only the fields that changed from the prior record are shown; unchanged values are inherited from the row below. The oldest row (first known record) shows the initial state.
Note on permit dates: for TX this column reflects the completion permit on file (W-2 / G-1), not the original drilling permit (W-1). A re-completion later in the well’s life creates a new permit_date entry, which is why a permit can date after the spud.
| Update Date | What changed | Operator | Field | Status / Type |
|---|---|---|---|---|
| 2022-09-15 | Administrative re-save | LAKOTA ENERGY, LTD. | NEWARK, EAST (BARNETT SHALE) | Producing / Horizontal |
| 2022-08-05 |
New permit 2022-08-05 |
LAKOTA ENERGY, LTD. | NEWARK, EAST (BARNETT SHALE) | Producing / Horizontal |
| 2018-04-13 | Administrative re-save | LAKOTA ENERGY, LTD. | NEWARK, EAST (BARNETT SHALE) | Producing / Horizontal |
| 2018-02-02 |
Initial filing Permit: 2018-02-02 Spud: 2017-07-28 Completion: 2018-01-09 |
LAKOTA ENERGY, LTD. | NEWARK, EAST (BARNETT SHALE) | Producing / Horizontal |